Location | Equipment | Length (m) | Width (m) | Draft Pearl River Base (m) | Lifting Capacity (t) | Accommodate Capacity for loading and unloading simultaneously |
No.1 Factory | Slipway | 75 | 18 | 3 | 1500 | 2 vessels over 17 meters |
Tugging | 80 | 30 | 4 | 1500 | ||
1#Steel Floating Dock | 85 | 19.3 | 4 | 1500 | ||
2#Steel Floating Dock | 80 | 18.3 | 5 | 1100 | ||
Building Berth | Indoor slipway area of 42,460 m2, with a total of 8 workshops, capable of accommodating 16 vessels for repair and construction. | |||||
Berth | Total berth length of 178 m, with a dock height of 4 m, a docking area width of 40 m, and a water depth of 4.7 m (Pearl River Base). The ship passing height under bridges along the route is 22 m. | |||||
No.2 Factory | Ship Lifting Platform | 90 | 20 | 4.8 (Including pier height) | 1600 | 3 vessels over 17 meters |
Building Berth | Indoor slipway area of 33,053 m2, with a total of 4 workshops, capable of simultaneously accommodating 8 vessels for repair and construction. | |||||
Berth | Total berth length of 279 m, with a dock height of 4 m, a docking area width of 40 m, and a water depth of 4.7 m (Pearl River Base). The ship passing height under bridges along the route is 22 m. | |||||
Zhuhai Branch | Tugging | 40 | 18 | 3 | 1000 | / |
Building Berth | Indoor and outdoor slipway area totaling 21,270 m2. | |||||
Berth | Total berth length of 200 m, with a dock height of 4 m, a docking area width of 50 m, and a water depth of 3 m. |