Home > Repair > Ship Repair Performance

“Jianghua 1” Return-to-Factory Maintenance Project

Date: 13th May. 2025   Hits: 13


• Length: 40 meters

• Width: 10.25 meters

• Depth: 3.5 meters

• High-Speed Passenger Vessel


Annual inspection, hull refurbishment, and inspection/replacement of corroded pipelines.